Environmental Audit Report - 2020-21 Deccan Cements Limited (DCL) - environmental responsibility

Environmental Responsibility

thermalAs a part of its Mission statement regarding delivery of high quality products in an environmentally friendly manner, DCL is committed to

  • Preserving the Environment and
  • Improving its Quality.

Preserving the Environment - Pollution control measures

Being in Cement industry, wherein the process involved is mainly size reduction at all the stages from raw materials to finished products, generation of dust is unavoidable. We at DCL have taken adequate steps to control and arrest dust emission and air pollution through installing the latest and well equipped control systems, e.g.,


  • Dust collectors are provided at all the transfer points from Crusher to Rawmill, coal grinding and conveying systems
  • The Primary Crushers are provided with bag type dust collectors of required sizes and air volume to dedust the crushing station. They are also provided        with high pressure water sprinkling systems at the hopper and in feeders to suppress the dust, which emanates during dumping and crushing
  • The Vertical Raw Mill and Pyro systems are connected to RABH (Reverse Air Bag House)
  • Dust emission during cement grinding at both Ball Mills and Vertical Roller Mill are arrested by dust collectors installed thereat
  • Packing houses are also provided with dust collectors and suction points at all generating areas to ensure dust free working environment
  • Water sprinklers are also provided at required transfer points to suppress fugitive dust.
  • Dedicated water tankers are engaged at both mines and plant to sprinkle water to reduce fugitive dust generation on haul roads and internal roads
  • All the stacks are provided with dust monitors, data of which are uploaded to APPCB server, available for public information.
Improving the Quality of Environment - Green belt development

DCL takes every possible step to develop greenery in and around the plant. As the Plant is in a rocky area, special attention is required to plant and develop each sapling. Preferred plants are selected as per advice received from Department of Social Forest.

  • 20,000 plants of various species are planted over an area of 16 hectares inside the lease area of the Mine
  • 9,500 plants are planted in an area of 7.50 hectares in and around the mining lease area
  • A well designed garden and lawn is maintained inside the plant
  • Separate green belt development programme is implemented over an area of 17 hectares adjacent to the residential colony wherein species like       Mango, Neem, Oak, Teak and other variety of trees are planted.

MoEF Six Monthly Compliance Report

MoEF - Six Monthly Compliance Reports
pdfMine-2 pdfMine-3 pdfPlant pdf3rd Party Test Report-30.09.2023

Environmental Audit Report - 2022-23

Environmental Audit Reports
pdfMine-2 FY 2022-23 pdfMine-3 FY 2022-23 pdfPlant FY 2022-23

Environmental Approval Documents

Environmental Approval Documents
pdfEnvironmental Approval Documents pdfEnvironment Clearance Document (EC)-Cement Plant Expansion pdfEnvironment Clearance Document (EC)-Expansion of Lime Stone Mine-3 pdfConsent Order No. 230824051032 dated 01.02.2023

© 2019 Designed By F-Grade All Rights Reserved